peach info Homepage
Forum Home Forum Home > User Manual > Workshop > Job Card
  New Posts New Posts
  FAQ FAQ  Forum Search   Register Register  Login Login

Parts/Labour

 Post Reply Post Reply
Author
Message Reverse Sort Order
Guests View Drop Down
Guest
Guest
Post Options Post Options   Thanks (0) Thanks(0)   Quote Guests Quote  Post ReplyReply Direct Link To This Post Topic: Parts/Labour
    Posted: 16-Apr-2007 at 08:55

         Parts/Labour

The screen initially displays the Service Details grid.

 
This can be toggled at any stage to the Parts grid –
 
 
As amounts are entered, the total for parts and labour calculates at the base of the screen-
 
 
If the Hours checkbox is ticked, the cursor will default to the Qty column in the service grid and multiply Qty by Price to determine the total.
 
Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.04
Copyright ©2001-2015 Web Wiz Ltd.

This page was generated in 0.082 seconds.